Показать сокращенную информацию
dc.contributor.author | Ibatullina A.A. | |
dc.contributor.author | Safiullin A.R. | |
dc.date.accessioned | 2022-02-09T20:41:45Z | |
dc.date.available | 2022-02-09T20:41:45Z | |
dc.date.issued | 2021 | |
dc.identifier.issn | 1800-6450 | |
dc.identifier.uri | https://dspace.kpfu.ru/xmlui/handle/net/169673 | |
dc.description.abstract | The relevance of the study is due to the lack of a unified approach to implementation of projects at the federal level, article aims at developing a mechanism for managing labor costs of the project. The leading approach to the study of the problem is the development of the matrix “specialization-competence” and a mechanism for optimizing labor costs. Testing was carried out in JSC “Kazan ElectrotechnicalPlant”. The regions-leaders of instrument-making are defined. In the project No. 1 there was a decrease in labor costs by 19%, overtime by 3 times, the cost of 1 standard hour by 4%. As a conclusion, the theoretical aspects of an integrated approach to the management of industry projects are put forward. The materials of the article are valuable for the management of the region’s economy. | |
dc.relation.ispartofseries | International Journal for Quality Research | |
dc.subject | Industrial policy | |
dc.subject | Industry project | |
dc.subject | Labor costs | |
dc.subject | Optimization | |
dc.subject | Project management | |
dc.title | The Concept of Project Management at the Meso-Level on the Basis of Network Planning of Works With the Development of Methods of Labor Costs Optimization | |
dc.type | Article | |
dc.relation.ispartofseries-issue | 2 | |
dc.relation.ispartofseries-volume | 15 | |
dc.collection | Публикации сотрудников КФУ | |
dc.relation.startpage | 579 | |
dc.source.id | SCOPUS18006450-2021-15-2-SID85107772349 |