dc.contributor.author |
Ibatullina A.A. |
|
dc.contributor.author |
Safiullin A.R. |
|
dc.date.accessioned |
2022-02-09T20:41:45Z |
|
dc.date.available |
2022-02-09T20:41:45Z |
|
dc.date.issued |
2021 |
|
dc.identifier.issn |
1800-6450 |
|
dc.identifier.uri |
https://dspace.kpfu.ru/xmlui/handle/net/169673 |
|
dc.description.abstract |
The relevance of the study is due to the lack of a unified approach to implementation of projects at the federal level, article aims at developing a mechanism for managing labor costs of the project. The leading approach to the study of the problem is the development of the matrix “specialization-competence” and a mechanism for optimizing labor costs. Testing was carried out in JSC “Kazan ElectrotechnicalPlant”. The regions-leaders of instrument-making are defined. In the project No. 1 there was a decrease in labor costs by 19%, overtime by 3 times, the cost of 1 standard hour by 4%. As a conclusion, the theoretical aspects of an integrated approach to the management of industry projects are put forward. The materials of the article are valuable for the management of the region’s economy. |
|
dc.relation.ispartofseries |
International Journal for Quality Research |
|
dc.subject |
Industrial policy |
|
dc.subject |
Industry project |
|
dc.subject |
Labor costs |
|
dc.subject |
Optimization |
|
dc.subject |
Project management |
|
dc.title |
The Concept of Project Management at the Meso-Level on the Basis of Network Planning of Works With the Development of Methods of Labor Costs Optimization |
|
dc.type |
Article |
|
dc.relation.ispartofseries-issue |
2 |
|
dc.relation.ispartofseries-volume |
15 |
|
dc.collection |
Публикации сотрудников КФУ |
|
dc.relation.startpage |
579 |
|
dc.source.id |
SCOPUS18006450-2021-15-2-SID85107772349 |
|